|
Introduction |
|
|
1.0 The Energy
Sector and Status of Dissemination of RETS in
Ethiopia |
7 |
|
1.1
Introduction |
7 |
|
1.2 Energy
sector in Ethiopia |
8 |
|
2.0 Status of
dissemination of renewable energy technologies in
Ethiopia |
12 |
|
3.0 Geothermal
energy and cogeneration development in
Ethiopia |
14 |
|
4.0
Methodology |
15 |
|
4.1 Methodology
and approach |
15 |
|
4.2 Sources for
updated and current data |
15 |
|
5.0 Prospects
for Geothermal Energy Development in Ethiopia
|
17 |
|
5.1 Background:
global development of geothermal energy |
17 |
|
5.2 Geothermal
Energy in Ethiopia |
20 |
|
5.3 Challenges
Encountered in the Utilization of the Pilot Geothermal Plant
at Aluto Langano |
22 |
|
5.4 Future
prospects of geothermal energy utilization for power
conversion in Ethiopia |
30 |
|
6.0 Challenges
Facing Dissemination of RETs In Ethiopia: Implications for
Cogeneration Development |
41 |
|
6.1 Biomass
Cogeneration - Fundamentals |
41 |
|
7.0
Conclusions and Recommendations |
51 |
|
8.0
References |
57 |
|
9.0
Appendices |
63 |